Port of Veracruz operations kickoff — second week of January in Boca del Rio
Production of the operations kickoff of the Port of Veracruz that the port authority and logistics operators organize each second week of January in Boca del Rio to align the year operational calendar, validate the investment plan, and kick off the safety program. We produce the auditorium at the Port precinct, LED screens, bilingual Spanish-English presenter, port director's video, POP material, attendee kit (technical tote with powerbank, thermos and notebook with regional lonaria cover), premium gift for strategic operators (Casio watch, Cross pen, travel luggage), the Operator of the Year plaque carved in wood by a regional carpenter, closing cocktail with huachinango a la vera, arroz a la tumbada, Cordoba coffee and tequila. Runs from 200 pieces for boutique event up to 1,800 pieces for volume kickoff with logistics operators from the Gulf of Mexico.