MOQ, lead times and CDMX logistics
MOQ depends on model and technique. Standard screen print: 50 pieces per design (one color, one size, one location). Embroidery on polo: 36 pieces. DTF full color: 30 pieces (because of the film cost). Sublimation: 24 pieces. For programs that mix sizes (S, M, L, XL) and colors, we run percentage distribution — you tell us 30% M, 40% L, 20% XL, 10% XXL and we fill that proportion.
Production lead time runs 7–10 business days on standard line; 3–5 business days on rush with a +30% surcharge. Delivery inside the Periférico–Viaducto circuit (Benito Juárez, Miguel Hidalgo, Cuauhtémoc, Coyoacán, Álvaro Obregón, Magdalena Contreras) is usually same-day if the order is confirmed before 11:00; next-day to the rest of the metro area and surrounding states. For corporate-tower deliveries with appointment, we coordinate with reception or security for access. For long runs (3,000–10,000 pieces) we run dedicated freight in CDMX with loading-dock drop-off.
Invoicing runs on CFDI 4.0 with the SAT, itemizing 16% VAT. We need your current fiscal-identification certificate (constancia de situación fiscal) and, if you work with purchase orders, the open PO. When payment is in USD wire from a foreign HQ, we issue the withholding voucher so your Mexican tax department applies the credit.