In-flight product modifications
How to adjust quantities, sizes, colors, technique or added pieces on an order that is already confirmed or in production.
The product can also be adjusted, with its own caveats
A modification is not the same as a commercial change. Here we are already touching the product: how many pieces get made, in which sizes, with what color, which technique, and whether we add or remove lines from the batch. Each of those decisions hits a different point of the process and that is why cost and feasibility shift.
The ideal window for a modification is before the order enters production. At that moment we can still adjust sizes without reworking markers, change colors without dumping ink mix, shift quantities without re-quoting anything. That is the cheap zone of the change. After production has started every modification carries technical implications that translate into time and cost.
When a size modification arrives we check the original size matrix first. If the new sizes keep the same S, M, L and XL proportion we adjust the quantities with no problem. If the client wants more XL and less M we verify whether the fabric already cut can be recut for other sizes or whether the lay needs to be reassembled. That last scenario costs because it implies downtime and pattern review.
For color changes during production we usually evaluate whether the ink has not been mixed yet. If the mix is already done and the ink is loaded on the press we finish that batch in the original color and process the change as a second batch. The reason is technical: dumping mixed ink contaminates the recovery system and creates uniformity loss for future runs.
When the client wants to add extra pieces we evaluate two routes. If the main order has not entered production yet and the line has capacity we add to the original batch. If the order is already running we usually open a second order with its own file and its own delivery, so we do not delay the main order.
For piece removals we apply the inverse logic: if the material has not been cut or the substrate prepared we deduct it from the batch. If the material has already been cut we return it to inventory or reuse it on another order. The early-removal fee is deducted from the final invoice and documented in the administrative close.
The most common case we see is the size curve modification after the client confirms an initial list and later, after receiving pre-bookings from their team, discovers they need more large than planned. We usually suggest merging the modification with the client's next open order so the size curve stays consistent and the brand does not end up with two hundred XL shirts sitting in a warehouse.
Frequently asked questions about product modifications
What marketing and operations teams most often ask when a confirmed order needs a product adjustment.
How late can I modify sizes at no cost?
As long as the order has not entered production we adjust the size matrix at no charge. After the fabric is cut or the marker released, size modifications carry a lay-rebuild fee plus the downtime cost.
Can I change a color after confirmation?
If the ink has not been mixed yet, yes. If it has been mixed and loaded we finish the original batch and process the change as a second batch so we do not contaminate the ink recovery system.
What if I want to add pieces that were not in the original order?
If the main order has not entered production and the line has capacity we add to the original batch. If it is already running we open a second order with its own file and its own delivery date.
Can I remove pieces from the order?
Yes, as long as the material has not been cut or prepared. If it has been cut we return it to inventory or reuse it on another order. The early-removal fee is deducted from the administrative close and documented.
Can I switch printing technique mid-order?
Only before production starts. Once the technique is chosen and the file is prepared, switching to another requires a re-quote and a reschedule because each technique uses different substrates and finishes.
How do modifications affect the delivery date?
It depends on scope. Minor tweaks like sizes or small numbers rarely shift the date. Color, technique or large-quantity changes can push delivery between three and ten business days depending on complexity.
What if the modification is confirmed after part of the batch is already packed?
If the packed merchandise does not conflict with the modification we ship it as is and process the difference as a second batch. If there is conflict we open a replacement order at preferential pricing and write down the already-packed merchandise.
Related FAQs
Other topics where adjusting the product on the fly is common.
Does your order need a product adjustment?
Send us the order number and the modification. We reply the same day with the feasibility, the date impact and, if applicable, the corresponding fee.